Dear Antony and Friends,
Perfect is the word that comes to mind when I try to describe your love and support towards building of this house of a widow. I don’t think I myself even could have done anything better. Only someone with great taste will be able to do what our Lord has called us to do so. Your generosity is as great as your sense of style.
These are the words of Shobavathi,l who has been helped by you all. “it was my hearts desire to build for me a house, but when I used to look at my situation where I could not manage my daily food, I used to question God why at all you gave me a birth. But my God did not leave me. He gave me a shelter to live. I am thankful to all those who have supported me to build the house. I would never forget till my death the help that I have received from all.” I have drafted as it is the words of her without any exaggeration.
I have given below the complete summary of the house construction.
Once again, I am very much grateful the help and support that I have gained from you all. Stay blessed always. Gentleness, self-sacrifice, and generosity are the exclusive possession of no one race or religion.
Thanking you,
Yours in Christ,
Fr.Wilfred Naveen D’Silva ofm Cap
Financial transaction made during Shobavati’s house construction
Total money received “two lacks eighteen thousand only”
Money received
From Antony and group 1,21,000.00
From sisters of DSS 27,000.00
From the friends of Fr. Wilfred 70,000.00
Total amount received 2,18,000.00
Complete details of utilization of money for the construction
SL.No |
Particulars |
Expenditure |
1. |
For JCB (digging of the foundation), |
2500.00 |
2. |
Stones for foundation (three tractors) per tractor 1200x3 |
3600.00 |
3. |
Laterite stones 1800x17 |
30600.00 |
4. |
White powder (Msand) |
1400.00 |
5. |
Cement |
14080.00 |
6. |
For windows angler |
5250.00 |
7. |
Kadapa stone |
2850.00 |
7. |
500 small bricks 500 x 6 |
3000.00 |
8. |
Black sand |
12800.00 |
9. |
White sand |
12400.00 |
10 |
Daily wages for 23 days |
42800.00 |
11 |
Kattala |
3600.00 |
12 |
Iron Bar |
1417.00 |
13 |
Iron pipe + transportation |
8135.00 |
14 |
GI roofing sheet (per kg 88) 216 x 88 |
19000.00 |
15 |
Roof fitting things |
640.00 |
16 |
Roofing work |
8000.00 |
17 |
Jelly |
2550.00 |
18 |
Red oxide, cement, sand for flooring |
13500.00 |
19 |
Primer, brush, sponge etc |
2300.00 |
20 |
Electrical work |
4230.00 |
21 |
Door work |
9850.00 |
25 |
Floor work |
10000.00 |
26 |
Three windows 3000x3 + fitting charges |
9500.00 |
|
Total Amount |
224,002.00 |
Wow, those words from her and father alone makes it so worth it!
ReplyDeleteSiby
once again thanks to all of you.
ReplyDeleteFr. Wilfred Naveen D'silva
Very Happy to hear this news.
ReplyDelete